Within the framework of implementing the project "Reconstruction of the existing production", in 2013, LLC "Labinsky OEP" constructed framework & awning warehouse for storing packed oil as well as constructed the shop and assembled the equipment Husky GL 300 HPP 4.0 for manufacturing a preform and closure labels. The reconstruction of the boiler was performed and the equipment was replaced.